In recent years, the company's engineering projects have continued to increase, and most of the concrete mixing at construction sites is still dominated by on-site mixing. In order to standardize the management of concrete mixing, ensure the quality of concrete, and increase the construction speed of concrete projects. According to the actual situation of the company and the current development trend of concrete mixing plants, we have made a small and medium-sized concrete mixing plant model equipment configuration plan suitable for on-site mixing.
The concrete mixing plant is mainly composed of storage, batching, mixing, discharging, control and other systems and structural components. According to the number of times the aggregate needs to be upgraded in the concrete production process, it is divided into concrete mixing plant and concrete mixing plant. The aggregate is upgraded to complete the entire production process in a single stage, which is called a concrete mixing plant; the aggregate is upgraded to complete the entire production process in a two-stage process, which is called a concrete mixing station.
The on-site concrete mixing plant is simple in equipment and easy to install. It does not require special equipment, but the size of the project task, construction site conditions, machinery and equipment, etc. must be considered and set up according to local conditions. Generally, it is advisable to adopt a fluid combination method, so that all mechanical equipment adopts an assembly and connection structure, which can basically achieve convenient disassembly, assembly and transportation, which is conducive to construction site transfer. In the plane layout, the cement warehouse is arranged on the side of the mixer and upstream of the surface water flow. Pay attention to moisture prevention. The arrangement of sand and stone is flexible, but it should be as close as possible to the loading platform of the mixer. The scale is closer to the hopper. The stacking of various raw materials should be convenient for transportation and can be directly unloaded to avoid secondary handling.
For the equipment configuration work of the on-site concrete mixing plant model, the size and scale of the project, the type and characteristics of the project, and the topography of the construction site should be considered first. The size and scale of the project are the primary factors and the main basis for compiling this configuration plan. We must first determine the high value of the daily concrete demand of the project based on the total demand for concrete and the construction period of concrete pouring. At the same time, we also need to design different mixing plant layouts according to the different characteristics of the project type: civil engineering, industrial engineering, installation engineering, municipal engineering, etc., to meet different engineering requirements.