1. Carefully inspect and timely detect troubleshooting
1) Do not overload concrete mixer truck on the road, otherwise it will be troublesome to the tank. The concrete can not be stopped for more than 2 hours, and the C40 type or above grade concrete can not stop.
2) Check engine oil, antifreeze, lubricating oil and cooling water before ignition. If it is insufficient, it should be added again.
3) After the cement mixer lorry is started, let the can rotate at a low speed, check the tire pressure around the car, whether there is a leaking tire, and then use a screwdriver to remove the stone in the seam and check.
4) Whether there is a nail or the like stuck in the tire.
5) Check the lights again, especially the waist lights. Make sure that the tires are often stacked on the construction site, and the tires are often the most weak.
6) Wipe the rear view mirrors on both sides with a rag, window glass, complicated road conditions on the construction site, poor lighting, and the line of sight must be guaranteed first.
2. Ensure that there is enough water in the water tank, and there is a water reducing agent
For various reasons, the materials are too dry. When there is no water to add or discharge, the water reducing agent is a life-saving straw. Otherwise, you must take more money to maintain it.
3. Confirm that the mixing tank is in a stopped state.
For the cylinder is in a high-speed rotation state when the engine is started, the instantaneous force will be very large, and the reducer will be injured.
For driving safety, please check your small concrete mixer truck as above.