Concrete mixing station and asphalt mixing plant are all the construction professional equipment. In order to ensure the concrete quality standard, we not only should pay attention to the matching problem of raw materials, but also will arrange concrete water at the same time.
When concrete mixing station produces concrete, it needs to use a lot of raw materials and aggregate, and it also needs to pay attention to the water consumption when they are compared. It has been proved that less water will affect the strength of concrete, but more water will reduce the durability of concrete.
As for the water consumption in the operation of concrete mixing station, it is necessary to strictly test the performance of each material before controlling the above factors to reduce the water consumption. For example, the water consumption can be effectively reduced by using high content cementitious materials to improve the accessibility.
Or the admixture can be added to the HZS50 concrete mixing station, or the admixture with high efficiency and water reduction rate can be used to select suitable admixture and cement varieties. Improve the gradation of sand and stone, find out the ideal gradation of sand and stone for each blending ratio to improve the accessibility and reduce water consumption.
Try to communicate with the construction side of concrete mixing station as much as possible, and cooperate with the technical staff of the construction side to avoid excessive slump. It is important to realize that the greater the slump, the easier the pumping will be.
In general, concrete mixing plant water use in actual production and test with water can vary greatly, so be in strict accordance with the test match content is better than or close to the material choice, so as to make the concrete quality to meet the requirements.