After buying the concrete mixing station, everyone hopes to improve the production efficiency as much as possible. We need to remind everyone that if the concrete mixing station wants high productivity, it should be configured well first.
With HZS180 concrete mixing station for sale as an example, the theory of productivity is 180 cubic meters, by the industry experience, it is concluded that the actual production capacity of 120 ~ 150 cubic, then some customers order according to this theory, and will it bring trouble to users?
First of all, many small enterprises transport vehicles, concrete pumps and other products are chosen to rent. It is important to consider whether the vehicle can be put in place in time and whether the vehicle can transport concrete in time. After concrete discharging form outlet in the concrete mixing station, it must go into the truck for transportation immediately, if the vehicle does not reach the designated position, it will delay production.
Besides the problem of vehicle allocation, what about the production capacity of large concrete mixing plant enterprises? We assume that a transport vehicle’s passing though and loading concrete time is a total of 3 minutes, then the concrete produced by concrete mixing station needs 20 September 180 party truck to transport out entirely, it is very big a team, even raise the 20 vehicles with 9 cubic to transport, and in actual production, it is also difficult to do it in 1 hour.
The production capacity of concrete mixing station can not meet the actual production needs of customers. Therefore, when answering the customer’s question, haomei sales staff will explain the problem clearly, so as to avoid the loss of the customer caused by the failure of the customer to complete the work according to the contract deadline. If you want to know more, you can keep following this website.