Company News

News

Company News

How to deal with the sewage in HZS75 concrete mixing plant?

2018-07-13 16:43:35

When cement mixing plants are produced and transported, it is inevitable that a large amount of sewage will be produced. This has also become one of the main sources of pollution in the enterprise. So, how do we deal with the sewage in the station?

The main source of sewage in the enterprise comes from the large amount of wastewater generated by our cleaning concrete transport vehicles, pump trucks, the main station of the HZS75 concrete mixing station itself and the supporting equipment of its mixing station. The amount of wastewater in this part is very large, the concentration is relatively high, and the treatment difficulty is also very large.

In the wastewater treatment scheme, the slurry water and ordinary wastewater of concrete mixing station are firstly collected, and the slurry water in the concrete batching plant can be directly mixed with the water to be used for stirring water, which not only saves a certain production cost, but also solves well slurry treatment problems.

hzs75 concrete mixing plant

The site cleaning sewage and the rainwater collected in the station can be cleaned after the first-stage sedimentation, the second-stage sedimentation and the third-stage sedimentation, and collected in the clear water tank as the mixing production water and the vehicle cleaning water, thereby realizing the recycling of the sewage in the station.

The above requirements for sewage treatment solutions can achieve the production requirements of zero discharge of sewage in concrete mixing plant enterprises, and ensure that concrete production enterprises meet environmental protection production standards. The sewage treatment solutions are also implemented in many enterprises and have achieved good results. 

Related articles
Online message
    Message
    Online Customer Service