The small concrete pump#mce_temp_url# brake system ensures sensitive, reliable, effective and non-running deviation. At the same time, the procedures of imprinting and printing meet the requirements of vehicle inspection. The free travel of the brake pedal complies with the requirements of the instruction manual. The small concrete pumps sale alarm device and emergency brake switch work ensure safety and reliability. The running plate and protective railing of the small concrete pump should be fully installed after installation. The safety warning signs and related operation signs should be complete and conspicuous. The operation room should be equipped with fire-fighting equipment.
The hydraulic system of the small concrete pump is usually equipped with safety devices to prevent overload and hydraulic shock during the installation process. The adjustment pressure of the general safety relief valve must not exceed 110% of the rated working pressure of the system. The rated working pressure of the system cannot be greater than that of the hydraulic pump. Regulating the installation of equipment can effectively improve the pumping efficiency. The behavior of modifying the small concrete pump is to improve the performance of the equipment.
The performance of small concrete pump is random and different. When selecting the model, in addition to considering the amount of pouring on the coagulation, the type and structure of the building, construction technical requirements, site conditions and surrounding environment should also be considered. The main performance parameters of the commonly used small concrete pump trucks should be consistent with the construction requirements or slightly larger. If the capacity is too large, the utilization rate is low; if it is too small, it will not only meet the construction requirements but also accelerate the loss of small concrete pump trucks.
The number of small concrete pumps used can be calculated based on the amount of concrete poured, the actual delivery volume of the single machine, and the construction work time. For concrete pumping construction projects with large amount of disposable concrete pouring, it is necessary to have a certain reserve amount in addition to calculation. In addition, the concrete mixing station with an annual output of 10-15 thousand m3 needs to be equipped with 2-3 concrete pump trucks.